Making Of the Azura



Azura's Atrium under construction


Azura's massive twin propellers and rudders



Painting Azura's name onto the bow


Water starts to fill the dry dock
around Azura
 


Making final preparations for Azura's float-out

The tugs prepare for Azura to float-out

Azura under tow

Azura towers over the tugs

Azura is manouvered alongside to continue construction

< Back



Terms & Conditions   |  Contact Us
Copyright © 2005 UKcruises.com. All rights reserved.